HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How is the coking time determined when the number of outputs changes?

2010-11-09View Original

Thread Content

We have 2X55-hole ramming coke ovens in operation; currently, a three-shift system is used, with 2 ovens of 20 holes each being produced per shift (120 holes per day in total). The coking time is 22 hours, and the operating time for each hole per oven is 20 minutes. If it is to be changed to 2 X15-hole batches per shift (90 holes per day), how should the coking time be determined?
Reply #22010-11-09
Coking time = Turnover time – Empty furnace time (about 3–5 minutes): ((2X55X24/90)X60–3)/60 = 29.2833 hours. The coking time for 90 furnaces is 29 hours and 17 minutes.
Reply #32010-11-09
Reply to 2# SwimmerUnrestricted: 24÷90=X÷110; X=29.33. X represents the turnaround time. Assuming the operation time is 5 minutes, the coking time is 29.33×60-5=1754.99 minutes, which equals 29.25 hours
Reply #42010-11-09
The simple calculation is 22*120=90*X, so X=29

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.