HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How is the elevation of the crane track in the repair shop determined?

2010-11-10View Original

Thread Content

How is the elevation of the crane track in the repair shop determined?
Reply #22010-11-11
Does it refer to the determination of the elevation during the installation process, or the determination of the design elevation? A level, scales, and a tape measure used for construction and installation are sufficient to determine it. During the design phase, factors such as the clear height of the workshop building, the installation location, and usage requirements must be taken into account.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.