What level of operation have the MTP units at Duren and Ningmei reached?

2010-11-11View Original

Thread Content

This post was last edited by jordan569 on 2013-1-6 20:53. Have all the problems with Shell stoves in Datang Dolun been resolved? Can it be started now? When will the official commissioning of the entire plant take place? ? Ningmei’s plant should have started operating at full capacity by now. Was the furnace at GSP started successfully? Has the CO conversion unit been started up now? ? When will we be able to reach the MTP stage in terms of progress? . Note # ) # # , . hcbbs
Reply #22010-11-11
Ningmei MTP has already produced qualified products; trials are set to take place in December this year
Reply #32010-11-12
2#: I know that Ningmei MTP has successfully produced propylene during trials, but the operation was not very stable; modifications have already been made. I want to know the details regarding driving starting at the end of October. Those who know please come in and talk!
Reply #42010-11-13
I heard some time ago that Shell’s furnace at Doron was successfully brought online; it’s really frustrating to not know when the conversion unit, low-temperature methanol washing unit, methanol synthesis unit, and distillation unit will be put into operation!
Reply #52010-11-13
At the current stage, Dolun Coal Chemical’s main focus is on the MTP unit; however, the factors that primarily hinder the progress of commissioning are external air separation systems, utility services, and the issues related to the company’s own power plant. It is believed that if the issues related to the external piping systems are properly resolved, particularly ensuring a stable supply of nitrogen at low and high pressures as well as steam at medium and high pressures in terms of both quantity and quality, the commissioning of the MTP unit will proceed more smoothly.
Reply #62010-11-14
Reply to 5# abc13864636100: How to manage the water-cooled operation of low-temperature methanol washing and methanol distillation in winter? I don’t think I’ll be able to watch it this year!
Reply #72010-11-14
The Shell furnace has always been a stumbling block for Toron MTP! If this tiger is killed, then success will be within reach~~! Looking forward to good news! !
Reply #82010-11-15
Reply to 7# aigo: No company in China has yet managed to defeat this ‘tiger’ successfully; it’s not a matter of the skill level of the technical staff.
Reply #92010-11-15
This post was last edited by jordan569 on 2010-11-15 13:17. Exactly! I hope a friendly way can be found to resolve this issue with the furnace; otherwise, the investment of hundreds of billions will end up as scrap metal! This stove from Shell failed to ignite the coal; instead, it first ignited the flames in the various units that were being fed with fuel! Alas!
Reply #102010-11-19
The GSP project at Ningxia Coal is progressing rapidly; Boiler No. 3 has already produced crude gas, and preparations are now underway to start up Boiler No. 4
Reply #112010-11-19
Hoping for success soon, whether it’s Ningmei or Datang

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.