HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Normal design cycle

2010-11-12View Original

Thread Content

This post was last edited by jintchinssen on 2010-11-12 at 18:48. Under normal circumstances, how long is the design cycle for the hydrogenation unit in an oil refining complex? How long does the preliminary design and the detailed design take?
Reply #22010-11-12
It depends on the scale of your facility; for projects with an investment of over 100 million yuan, the design period is generally two years, with one year each for preliminary design and detailed design, and another year for on-site construction.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.