We need to place orders for the equipment soon; let’s discuss what considerations there are during the ordering process
There are many things that need to be taken into consideration, and it’s impossible to explain them all in just a short time. It depends on your specific circumstances: the material of the equipment, its specifications, pressure rating, delivery time, the seller’s credibility, payment terms, and so on. I’ve mentioned quite a lot of things. I’ve added you on QQ; we can discuss this further if there’s a chance
Qualifications, performance in this industry, price competitiveness, delivery time, ability to cover losses and provide compensation, registered capital, annual sales volume
This post was last edited by psw1420 on 2010-11-18 at 19:32. Thinking back (and this is certainly not a comprehensive list), factors include interface issues between equipment and pipelines, as well as the requirements imposed by the working environment and tasks on the equipment (such as tanks), including welding methods and whether the equipment is horizontal or vertical. Additionally, when purchasing such equipment, it must be compatible with your design considerations, such as the space required and the size of the facility. If there are cooling systems involved (for example, if the circulating water system isn’t part of the existing utility infrastructure but is designed separately), then factors like cooling efficiency also need to be taken into account. My thoughts are in chaos. . . = =I looked back at it myself and I was also confused.
Although the main design and manufacturing requirements are met, performance still matters; in particular, it is important to be included in certain group procurement lists. Some manufacturers produce products of such poor quality that you can’t get good quality at a low price