HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Storage and Transportation Technology: [Question of the Day] 10-11-16 [Tuesday]

2010-11-15View Original

Thread Content

This post was last edited by flute6 on 2010-12-7 00:29. Question: The initial flow rate when filling with oil should not exceed ( ). A、1m/s B、2m/s C、3m/s D、4m/s Note: 1) Those who answer will be rewarded; everyone is encouraged to provide detailed explanations. 2) Please hide your replies; the method for doing this is: http://bbs.hcbbs.com/thread-492556-1-1.html. Do not edit the replies after posting them. 3) The answer will be visible immediately after responding. Answer released: Answer: A. Control of static electricity generation in storage tanks: Before the oil filling pipe is submerged 0.6 meters or two times the diameter of the pipe, the speed must be kept below 1 m/s ; Avoid pumping large amounts of air or other entrained gases into the storage tank along with the liquid.
Reply #22010-11-16
The initial flow rate of the oil should not exceed (1 m/s)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.