What is WBS in project management? How to apply it? Are there any practical examples? Please ask an expert for guidance!
Work Breakdown Structure (WBS) is a way of grouping project elements based on deliverables; it outlines and defines the entire scope of work for a project. Each level down represents a more detailed definition of the project’s tasks. Creating a WBS code for a project is one of the most fundamental tasks in project management, and it is also extremely important. Here is an example: (Partial excerpt) 1 Legal approvals 1.1 Project site selection approval 1.2 Project planning permit 1.3 Project registration ..... 2 Project preparation 2.1 Establishing the project team 2.2 Overall control plan 2.3 Rules, regulations, and procedural documents 2.4 Land acquisition for the project 2.5 Site leveling ........... 3 Surveying and design 3.1 Preparation of data 3.2 Geological surveys 3.2.1 Preliminary surveys 3.2.2 Detailed surveys 3.3 Methanol process design 3.4 Overall design 3.4.1 Document preparation 3.4.2 Approval by Sinopec ..... 4 Procurement 4.1 Long-term equipment 4.1.1 Acetylene plant 4.1.1.1 Static equipment 4.1.1.1.1 Electrostatic precipitators 4.1.1.1.1.1 Receiving technical quotes 4.1.1.1.1.2 Tendering and contract signing 4.1.1.1.1.3 Delivery of equipment to the site ........ 5 Construction 5.1 Main process units 5.1.1 Acetylene plant 5.1.1.1 Partial oxidation 5.1.1.1.1 Civil works 5.1.1.1.2 Water supply and drainage 5.1.1.1.3 Equipment 5.1.1.1.4 Process pipelines 5.1.1.1.5 Electrical systems 5.1.1.1.6 Automation systems 5.1.1.1.7 Purging and pressure testing 5.1.1.1.8 Individual unit testing 5.1.1.1.9 Inspection, adjustment, and rectification ........ 6 Commissioning 6.1 Acetylene plant 6.2 Vinyl acetate plant 6.3 Polyvinyl alcohol plant 6.4 Methanol plant 6.5 Water supply, drainage, and fire protection systems 6.6 Waste water treatment facility 6.7 Circulating water system 6.8 Boilers and power generation 6.9 Process and heating pipelines ....... 7 Production preparation 8 All units ready for operation 9 Completion acceptance 9.1 Acceptance of individual units 9.1.1 Acetylene plant 9.1.2 Vinyl acetate plant 9.1.3 Polyvinyl alcohol plant 9.1.4 Methanol plant 9.1.5 Water supply, drainage, and fire protection systems