HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues related to the submission for inspection of process pipeline sub-projects

2010-11-16View Original

Thread Content

After the installation of process pipelines is completed, it is necessary to submit applications for inspection by category. This is done in accordance with the tables specified in GB50184 (Quality Inspection and Evaluation Standards for Industrial Metal Pipelines). These tables contain various records from the pipeline installation process; they are different from the records required for project handover. Many of these records are related to process control, such as records of electrode baking and welding records. Are these records also subject to inspection? Please, experienced colleagues, share how you submit inspections for pipeline sub-projects
Reply #22010-11-16
This post was last edited by Canghai Yishengxiao on 2010-11-16 22:15. It’s not necessary. Only the acceptance records for the main processes and the commissioning records are required. There are also drawings. Generally, 8 sets are required.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.