HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Old problem

2010-11-17View Original

Thread Content

Another winter has arrived. I would like to ask: have you taken any measures to prevent freezing of the control valves in the system? Or do you just leave them as they are after completing the pipeline purging process?
Reply #22010-11-17
Do you mean a system that stops? ? The water inside needs to be drained; there’s nothing wrong with the control valve!
Reply #32010-11-17
Make sure to drain all the water inside! Especially fluorine-lined valves
Reply #42010-11-17
When not in use in winter, drain the liquid and dry it out. For particularly important valves that are not used for long periods of time, removing them for maintenance is the best approach

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.