HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Severe frosting on the water separator of the gas holder

2010-11-26View Original

Thread Content

Is there a lot of frost on the water separator in front of the gas holder (the unit is derived from compressed condensate recovery during polymerization)? What is usually the situation, and how to solve it?
Reply #22010-11-28
A lot of frost forms on the water separator in front of the gas holder: 1. This is caused by the presence of liquid monomer. Solution: 1. Provide steam tracing for the gas-water separator used in the polymer feed recovery process. (Multiple drains) 2. Secondary cooler – change cooling medium
Reply #32010-12-01
There is liquid VCM; considering solutions from this perspective should work
Reply #42010-12-01
Improper control during VCM recovery led to excessive condensation due to low temperatures in the liquid or gas phase, and this accumulation was not discharged in a timely manner. Treatment: Add coil heating at the bottom and middle-lower parts of the water separator, and carry out timely sewage discharge to prevent water ingress
Reply #52010-12-01
This post was last edited by qw87530778 on 2010-12-1 19:03. How is it that I haven’t encountered this situation before? This kind of situation will definitely not happen here. How can liquid VCM be used in polymer recycling? How do you carry out this process? ? ? ? ? ? ? ? ? ? ? ? ? :L:L Please specify what manufacturing process you use.
Reply #62010-12-01
Reply to 5# qw87530778: Monomers recovered through the compression condensation of polymers
Reply #72010-12-01
This post was last edited by qw87530778 on 2010-12-1 21:18. It was designed by Tianchen, and to date no frost formation has been observed
Reply #82010-12-01
Does that stuff go straight back to the gas holder? ? ? It’s different from the manufacturing process here.
Reply #92010-12-01
Upstairs, what the original poster mentioned is not the 70-square-meter Goodrich process
Reply #102011-01-02
It’s caused by excessive recycling; blowing it with steam will do. In future, be careful to control the amount of material recycled

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.