HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Questions regarding the installation of manholes and access holes

2010-11-26View Original

Thread Content

New specification clause 3.18 is not very clear regarding the requirements for inspection holes. The existing drawings for the separator with DN800 do not provide for any inspection holes, nor are there any devices that would allow for internal inspection; no special requirements for testing and regular inspections are specified either. Is there a problem with this?
Reply #22010-11-26
In accordance with the Fixed Volume Regulations and item 3.18 of Amendment 1, clear requirements are established for pressure vessels that have inspection holes or that require such holes but are unable to have them. The Code for Fixed Pressure Vessels has removed, through Amendment 1, those pressure vessels for which it is \"unnecessary\" to provide inspection holes. Therefore, it is necessary to determine whether inspection holes need to be provided in the separator based on the specific operating conditions and requirements of your equipment, and then follow the provisions of the Solid and Hazardous Materials Regulations

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.