HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking job recruitment information from Inner Mongolia Air Separation Z

2010-12-06View Original

Thread Content

This post was last edited by gader on 2010-12-6 21:06. Guys, can anyone tell me which coal chemical company in Inner Mongolia is hiring staff for air separation units? Thanks
Reply #22010-12-15
http://www.chemjob.com.cn/companyads/datangpower/
Reply #32010-12-15
You can try contacting him at QQ375982140
Reply #42010-12-16
Do a Google search on Baidu, and there’s a lot of such information
Reply #52010-12-17
http://www.chemjob.com.cn/companyads/datangpower/ Datang International Power Generation Co., Ltd. is one of China’s large independent power generation companies. The company was established in 1994 and issued H shares in 1997, listing in ** and London respectively. It was one of the first Chinese power companies to list in ** and one of the first Chinese companies to list in London. In 2006, it issued A shares domestically. Currently, the company is a Sino-foreign joint venture limited company. The company’s main business is thermal power generation; on this basis, it has formulated a diversified development strategy that focuses on the energy sector while also taking into account the expansion into related industries. In January 2009, the company established a specialized firm – Datang Energy Chemical Co., Ltd. – to handle the management of coal chemical and other energy chemical projects within the Datang International group. The Datang International Kheshikten coal-to-natural gas project is a key construction project under the Energy Chemicals Company. The Preparatory Office for the Keshiketeng Coal-to-Gas Project was established in May 2007, located in the northwest part of Keshiketeng Banner, Chifeng City, Inner Mongolia Autonomous Region. On August 20, 2009, it received approval from the **National Development and Reform Commission, making it China’s first coal-to-natural gas demonstration project to obtain such approval. The project takes advantage of the abundant lignite reserves in Xilinhot, Inner Mongolia, as well as the local water resources. It employs advanced international technologies such as coal crushing and pressurized gasification, oil- and sulfur-resistant shift reaction for the raw gas, cooling, low-temperature methanol washing for purification, compression refrigeration, the Claus-Scot sulfur recovery process, and methanization, to produce natural gas and other by-products. The designed capacity is 4 billion cubic meters of coal-to-natural gas per year, which is supplied to Beijing, the capital city, and surrounding areas through a 359-kilometer-long pipeline. The project is currently in the phase of large-scale construction. It is planned to achieve a production capacity of 1.34 billion cubic meters by 2011, 2.68 billion cubic meters by 2012, and the designed annual production capacity of 4 billion cubic meters by 2013. By then, it will be able to hold a leading position in the market thanks to its technical and scale advantages; the prospects for this project are very good. To meet the needs of project development and attract talented individuals, the preparatory office has decided to recruit professional technicians and managers in the field of chemistry and related areas across the country. Work address: Keshiketeng Banner, Chifeng City, Inner Mongolia. Applications for employment at this organization are accepted only online; paper resumes are not accepted. The information provided by applicants is kept confidential, and communication between the organizing committee and applicants takes place primarily via telephone.
Reply #62011-02-21
If you’re looking for someone through Panhai, you can give it a try

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.