This post was last edited by HT-L on 2010-12-10 23:41. I would like to know if the Shenhua Coal Chemical Baotou project has been completed, and what stage it is currently at. Thank you.
I want to learn* and understand it too! ! ! Please give some advice, experts
The test drive has already finished! 80% of the capacity is currently in use for production! Commercial operation started on January 1, 2011!
The equipment for transformation is broken, and production has come to a halt across the entire line. DMTO is performing well initially, with a load capacity of up to 95%. But we also need to consider the impact on the catalyst over a long-term operation period.
I’m very optimistic! ! ! ! I hope it runs smoothly! ! !
Refer to Lewies’ post at http://bbs.hcbbs.com/thread-666115-1-1.html, as it will be helpful to you
Reply to 5# Big Belly: She has already returned to work!
I’m only familiar with the methanol side. Currently, the vaporization process is operating at around 80% capacity, and the stability is acceptable. However, there are many issues with the equipment; it’s much better than when it was first tested. Commercial operation is scheduled to begin in January, but it seems that one set of equipment will need to be shut down for maintenance
Testing will begin on August 8th! It was parked for maintenance in November for a whole month! Production resumes in December
Correction for floor 5: It is MTO that glorifies Baotou, not DMTO; there is a difference between the two.