Thread Content
How should the differences in the work contents of 5-286, 5-637, and 5-640 be defined in the \"Anhui Province Quotation Table for the National Unified Installation Project Budget Quotas 2000\"? Our company manufactured and installed 2 chemical processing units on-site; one of them is a desulfurization tower with a diameter of 6 meters and a height of 38 meters. The distributor and end caps were purchased as finished components, while the cylinder was manufactured on-site ; The other one is a DN (12000/11000)*8000 MM regeneration tank; the orifice plates are manufactured by external suppliers, while the rest are fabricated on-site. Is it appropriate to apply 5-286 and 5-637, as well as 5-286 and 5-640, to these two devices simultaneously? Please give me some advice!
Can’t the fixed quota items be made clearer? This can also expand the pool of people who can provide advice
How should the differences in the work scope of the quota items numbered 5-286, 5-637, and 5-640 be defined, as per the quotas listed in the \"Anhui Province Quotation Table for the National Unified Installation Project Budget Quotas 2000\"? Our company manufactured and installed 2 chemical processing units on-site; one of them is a desulfurization tower with a diameter of 6 meters and a height of 38 meters. The distributor and end caps were purchased as finished components, while the cylinder was manufactured on-site ; The other one is a DN (12000/11000)*8000 MM regeneration tank; the orifice plates are manufactured by external suppliers, while the rest are fabricated on-site. Is it appropriate to apply 5-286 and 5-637, as well as 5-286 and 5-640, to these two devices simultaneously? Please give me some advice!
I’m not familiar with the details of the quota items in Anhui. Please send them over so I can take a look and give you some advice