Has anyone compiled a list of the procedures required to establish a new chemical plant?

2010-12-12View Original

Thread Content

What procedures are required to establish a new chemical plant? From the perspectives of land use, fire safety, environmental protection, lightning protection, tap water supply, landscaping, etc., what procedures are required in Europe? And what does smooth operation look like?
Reply #22010-12-12
This post was last edited by eleg on 2010-12-13 07:56. Reply to suhuoyi212: The approval procedures that need to be followed in the early stages of chemical plant construction are as follows: 1. Apply to the Development and Reform Commission for registration using a project proposal or feasibility study report; 2. After obtaining the approval for registration, apply to the land management department for planning permits and land use certificates, using the project’s feasibility study report and the approval from registration; 3. Based on the feasibility study report and the approval from registration, consult a safety consulting agency to prepare a safety assessment report for the project, and then apply to the local safety supervision department for approval regarding the project’s safety aspects; 4. For larger projects, it is also necessary to conduct an environmental impact assessment in accordance with the requirements of the environmental protection department and obtain approval for it; 5. Based on the feasibility study report, the approval from registration (including the approval from the environmental impact assessment), prepare an environmental impact assessment report and submit it to the environmental protection department to obtain its approval; 6. In some areas, occupational health assessments and energy efficiency evaluations are also required for the project.
Reply #32010-12-12
What was mentioned above covers most of the aspects. As a supplement: for hazardous chemical construction projects, there is an assessment of the safety conditions required for such projects prior to their establishment; after establishment, approvals are needed for the design of safety facilities, registration of the pilot production plan, and approval for the completion inspection of the project
Reply #42010-12-12
Could we go a bit deeper, regarding laws and regulations?
Reply #52010-12-13
In accordance with **Order No. 8 and local safety production licensing regulations
Reply #62010-12-13
Before the establishment of a hazardous chemicals construction project after the feasibility study is completed, a safety assessment of the project’s conditions must be carried out (which can be prepared by the enterprise itself); a safety evaluation report must then be prepared and submitted to the **security regulatory authorities for review and approval

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.