Confirmation of pipeline handover

2010-12-13View Original

Thread Content

This post was last edited by jintchinssen on 2010-12-16 at 10:50. Currently, in my workshop, the confirmation of completion of work related to HF is done by checking whether there is any smoke by opening the drain pipes. However, due to broken drain pipes in certain equipment and scaling in the bottom of the distillation tower, we realize that in future, the back-end systems of the plant will face an increasing risk of blockages in pipes and drain pipes caused by such scaling. Relying on the method of opening drain pipes to determine whether the system has been completely purged is not 100% reliable. We need to be extremely cautious when it comes to the completion of work and maintenance on HF systems. Do any of you have any effective solutions? Thank you!
Reply #22010-12-14
Strictly speaking, to determine whether a permutation is qualified, it should be determined through sampling analysis.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.