HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Storage and Transportation Technology: [Question of the Day] 10-12-15 [Wednesday]

2010-12-14View Original

Thread Content

This post was last edited by flute6 on 2010-12-16 08:48. Note: 1) All participants will receive a reward. 2) Please hide your replies; the method to do this is: http://bbs.hcbbs.com/thread-492556-1-1.html. Do not edit the replies after posting them. # Z0 y% 3) The answer will be visible after responding. After filling with oil, it should be left to stand for no less than ( ) minutes before sampling, temperature measurement, gauge checking, and removal of the ground wire are carried out. A、1 B、2 C、3 D、4 Answer: Option B. According to the \"Regulations on Static Electricity Safety for Liquid Petroleum Products\", allowing the liquid to stand still helps to eliminate static electricity more effectively
Reply #22010-12-14
Reply 1# Oil transfer arm B, 2 minutes
Reply #32010-12-14
Come in and learn* My answer: C
Reply #42010-12-15
D,,,,,,,,,,,

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.