HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to handle the intermediate joint

2010-12-23View Original

Thread Content

Regarding DIIBT4, in Zone 2 areas, what should be done when there are joints in the cables? Do the joints need to be welded, or should they be placed inside explosion-proof boxes?
Reply #22010-12-23
This post was last edited by dxj0422331 on 2010-12-23 at 15:04. The principle is that it’s not possible to do so, so it has never been attempted; I’ve only seen cables being locked with large copper sleeves under hydraulic pressure at zero temperature.
Reply #32010-12-23
Connection should be made through explosion-proof junction boxes or distribution boxes; terminal strip connections, crimping, or welding can all be used, but the key is to ensure a secure connection
Reply #42010-12-24
Another key point is that there must be no electric leakage
Reply #52010-12-24
If a junction box is used, do isolation boxes need to be installed on both sides of the junction box?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.