The specific details of the 3325 procedure
Three tickets, three fixations, three diagrams, five procedures, five records!
“Three types of tickets”: work ticket, operation ticket, and temporary power use ticket; “\"Three diagrams\": simulation diagram, secondary wiring diagram, cable routing diagram ; “\"Three systems\": 1. System of dedicated responsibilities for specific areas. That is, there is a dedicated person in charge of electrical matters in each area ; 2. Three-period system. “\"Three regulars\": regular maintenance, regular testing, and regular cleaning ; 3. Shift handover and routine inspection system. “25”: “Five Regulations”: Electrical safety, dispatching, operation, maintenance, and testing regulations ; “The “five records”: electrical operation records, duty records, inspection records, test records, and maintenance records. Among the five regulations, the power sector has dispatching regulations; in enterprises, the relevant aspects of dispatching regulations are outlined or emphasized in the Safety Regulations and Operating Regulations. However, there should also be Accident Handling Regulations, which specify the procedures to be followed in the event of an accident. The five types of records are \"operation records, maintenance records, test records, accident handling records, and equipment defect records\"; patrol inspection records and duty records should be included in the operation records. The equipment defect record should include records of defect resolution.
“Three types of tickets”: work ticket, operation ticket, and temporary power use ticket; “Three diagrams”: Simulation diagram (primary system diagram), secondary wiring diagram, and cable routing diagram ; “\"Three regulars\": regular maintenance, regular testing, and regular cleaning ; “The “Five Procedures”: electrical safety, dispatching, operation, maintenance, and testing procedures ; “Five records”: electrical operation, duty, patrol inspection, testing, and maintenance records
“Three types of tickets”: work ticket, operation ticket, and temporary power use ticket; “Three diagrams”: Simulation diagram (primary system diagram), secondary wiring diagram, and cable routing diagram ; “\"Three regulars\": regular maintenance, regular testing, and regular cleaning ; “The “Five Procedures”: electrical safety, dispatching, operation, maintenance, and testing procedures ; “Five types of records”: electrical operation records, duty records, inspection records, test records, and maintenance records. 1 Number of people who scored
The correction is the “3-3-2-5” work system. It’s “three three one five six” now”