Thread Content
What is the standard for charging fees based on the capacity of transformers? **Are there any standards in this regard, and what is the basis for charging by power companies? Is the fee for direct 6KV operation the same as that for stepping down the voltage to 380V?
As far as I know, it varies from province to province; I’m not sure which province brother 1# is from. As for the standards, there seems to be a set of \"Rules for Power Supply Operations\"; let’s take a look. Is the charging amount for the motor different from that for the transformer?
In Shaanxi, for capacities of 630 KW and below, the cost is 24 yuan per kilowatt per month; For capacities over 630KW, the rate is 32 yuan per kilowatt per month.
It seems to be 1.2 yuan per 1KVA, that’s probably the amount per month.
In Fujian, the cost is 24 yuan per KVA; a transformer with a capacity of 2000 KVA is used.
For Liaoning Province, are there specific business rules available for download?
It is recommended that you ask the marketing department of the local electricity company directly; they should be the most informed.
Just go to the local power supply office and take a look
Make a call or check the website; you can also ask your colleagues – in technology, communication is key
The charging standard for large-scale industrial electricity use consists of kilowatt-hour rate, basic tariff, and power factor adjustment fee. 1. Electricity cost = Actual electricity consumption by the user per month × Unit price per kilowatt-hour. 2. The basic electricity charge is calculated on a monthly basis = the capacity of the transformer used by the customer (maximum demand) × the basic electricity rate. The basic electricity charge is the fixed monthly fee, and there are two billing methods: maximum demand and transformer capacity. The maximum demand refers to the power consumption at the peak usage time (when all devices are in operation and the company is operating at its maximum capacity); this value is then multiplied by 38 yuan per kilowatt-month to determine the monthly basic electricity charge. The transformer capacity refers to the sum of the capacities of the transformers, multiplied by 28 yuan per kVA-month. 3. The power factor adjustment for electricity charges is a method of adjusting fees based on whether the user’s power factor meets the specified standard (the power factor standard is 0.9); the specific implementation details are provided in Appendix 2. This improves the utilization rate of power supply and consumption equipment, enhances voltage quality, and ensures grid safety.
The standards vary from region to region. When dealing with power supply authorities, there’s no need to ask for the source of certain regulations – it’s sufficient to have a meal together and explain things clearly; P