[Recommendation] 【Daily Question】2011-1-15~16 Project Management: (Saturdays, Sundays)

2011-01-15View Original

Thread Content

“The “three simultaneities” system stipulates that for all newly constructed, renovated, or expanded capital construction projects (works), technical transformation projects (works), and imported construction projects, the occupational safety and health facilities must meet the **prescribed standards and must be “( )” with the main project. It is generally referred to as the “three simultaneities” system. A. Simultaneous design, simultaneous construction, and simultaneous commissioning B. Simultaneous approval, simultaneous design, and simultaneous construction C. Simultaneous approval, simultaneous construction, and simultaneous commissioning D. Simultaneous design, simultaneous approval, and simultaneous commissioning 1. Please hide your replies to this post; no scoring will be given unless they are hidden. Hidden method: http://bbs.hcbbs.com/viewthread.php?tid=492556&page=1#pid2695620 2. Each participant will receive a wealth reward of 2 to 5 points; those who provide insightful and in-depth responses will receive higher scores. 3. Once the new daily question is released, the old posts will be closed. 4. The questions I’ve set are created based on relevant specifications and my own experience. Should there be any disputes regarding the suggested answers, please start a separate discussion. The replies to the answers can be found here: A
Reply #22011-01-15
A. Designed simultaneously, constructed simultaneously, and put into operation simultaneously
Reply #32011-01-15
D. Designed simultaneously, approved simultaneously, and put into production simultaneously
Reply #42011-01-15
A. Simultaneous design, construction, and commissioning* O2 ~ ^$ X: {8 ] B. Simultaneous approval, design, and construction : n) }3 w- Y, I D# u } C. Simultaneous approval, construction, and commissioning 5 I! ?9 d: d- S# f! M. X$ I7 | D. Simultaneous design, approval, and commissioning 2 Z' ]1 Answer: B

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.