The issue of weld layout

2011-01-17View Original

Thread Content

Does ASME specify what the minimum distance between two welds should be? What kind of welds are these two welds? Could it refer to the relationship between a main weld and a secondary weld? If it is mentioned, could you let me know in which chapter and section?
Reply #22011-01-17
Class A welds: The centerlines of adjacent longitudinal joints should be offset from each other or separated by at least 5 times the thickness of the thicker plate. If this cannot be achieved, radiographic testing shall be performed on a 4-inch (100 mm) length of the longitudinal joints on both sides intersecting each circumferential joint. See VIII-1, UW-9, (d)
Reply #32011-01-17
If there are two longitudinal seams, the poster may refer to ASME Volume VIII, UW-9 (d); the minimum spacing should be 5 times that of the thicker plate. Otherwise, at least 4 inches on each side of the weld must be available for RT inspection. As for the main welds and the accessory welds, they can intersect with each other; refer to ASME Volume VIII, UG-82.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.