HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

SAACKE load controller setup method ((HD 60 D2))

2011-01-21View Original

Thread Content

Our company uses a boiler from SAACKE Company; When the boiler is started up, the load cannot be controlled; as the load increases from 0 to 100, ignition occurs at a load level of 70, after which ignition fails ; (During normal ignition, the load varies from 0 to 100 and then from 100 to 0; ignition occurs around 0-10.) ; Now I want to know how to adjust the travel switch on the load controller ;
Reply #22015-08-14
It seems there is indeed something wrong with the SAACKE burner
Reply #32018-04-12
It is necessary to readjust the curve; contact the Liuding burner rapid service platform at 15633028158

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.