HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Questions regarding the function keys of the operation station

2011-02-01View Original

Thread Content

The control station uses a professional keyboard. After grouping the function keys under FUNCTION KEY in SH, when the operation station is restarted, all the contents grouped for each station are lost. Is there any good way to avoid having to regroup them every time? Thank you. There is one more question: is it possible to display the print data from a report on an operation screen?? That is, the operator can see in one diagram the data printed out by the report, which represents the data for many points at a certain time. :victory:
Reply #22011-02-15
Configure the function key groups on the operator station at the engineer station, and then download them.
Reply #32012-08-29
This post was last edited by Lin Xiangxi Yu on 2012-8-29 08:19. The previous reply has already addressed the first question, and I fully support it! In the engineer station configuration, define the function key groups for each operation station; this way, they will not be lost during subsequent installations. In your current configuration project, the function key settings for each operation station are empty; only the settings in.SH are applied on the operation stations. Therefore, after each offline DOWNLOAD, the.SH settings on the operation stations are overwritten. Second question: We have already managed to display report data in the form of flowcharts; this is achieved by configuring a specific interface that allows company managers to view production volumes and consumption levels for each shift in real time ; Daily output, daily consumption ; Monthly production, monthly consumption ; Annual production, annual consumption ; Real-time data on operating days, system load, and some production meters. The key in configuration is the derivation of data calculation expressions in the flowchart and the synchronized invocation of system time. ! ! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.