I would like to ask some expert who can explain what the installed load, service load, and structural load of pipe supports mean, and what the corresponding operating conditions are in CAESAR? Thank you
Reply #22011-02-09
The installation loads for pipe supports and hangers generally correspond to the SUS condition W+P in CAESAR, while the operating loads are usually W+P+T. Structural loads are presumably the loads that need to be provided to the structural engineering team; both installation loads and operating loads should be submitted to them for structural design. In the event of special conditions, such loads also need to be provided to the structural engineering team so that they can carry out design calculations, such as for accidental loads
Reply #32011-09-18
I’m a newcomer; is there any more detailed information available?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.