HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Emergency help in the industry—pipeline issues at gas stations

2011-02-15View Original

Thread Content

I’ve been working in chemical engineering design. Recently, I started working on the design of gas stations. Although it’s a relatively simple task, I still have a few questions I’d like to ask all the experts here. 1. After natural gas is compressed to 25 MPa by a compressor, how should the relevant piping materials be selected? (Pipeline wall thickness, standards, material, etc. Should valves use flanges, welding, or other connection methods?) 2. Today, I was studying a flow diagram of a gas station. After compression at 25 MPa, the pipe selected was D25X4. Logically, its nominal diameter should be DN20. But the valve chosen was DN15 instead? 3. For this same flow diagram, the D25X4 pipe was chosen for the outlet pipeline of the main station’s compressor with a capacity of 10,000 NM3/h; similarly, D25X4 was also selected for the outlet pipeline of the sub-station’s compressor with a capacity of 3,000 NM3/h. Is he wrong, or is it standard practice to use D25X4 pipes for the outlets of compressors at gas refueling stations (to accommodate storage wells and the nozzles of dispensers)? However, I also saw in the relevant codes that the velocity at the compressor outlet should not exceed 5 m/s. 4. Are the specifications of the natural gas compressors in the pressure stations fixed at present, and what are the available specifications? 5. What is the connection method between compressed natural gas pipelines, gas storage wells, and gas filling stations? 6. Gas storage wells: the inlet of gas filling stations has a fixed size
Reply #22011-02-16
I can help you choose the right one! I can explain it to you over the phone if needed! I’ve left you a message!
Reply #32013-05-24
Those upstairs, could you leave a phone number? Thanks!
Reply #42015-10-16
Could you give me a phone number too? I have the same problem; please, experts, help quickly!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.