Which department prepares the quotation document for eye washers?

2011-02-15View Original

Thread Content

Which department prepares the quotation document for eye washers?
Reply #22011-02-16
The quotation document for eye wash stations is prepared by the water supply and drainage specialty; however, according to the provisions of \"HGT 20519-2009 Unified Requirements for the Content and Depth of Construction Drawings in Chemical Process Design\", it should be prepared by the process system specialty.
Reply #32011-02-16
No one in our department is in charge; we were forced to carry out the process. The manager said, \"Who asked you to take charge of this?\" NND.
Reply #42011-02-16
Standard practice: occupational health measures are in place; if not, process controls and piping systems are used instead.
Reply #52011-02-17
The setting location and medium requirements for the process are specified, to be completed by the water supply and drainage team.
Reply #62011-02-17
During project construction, the process engineering team specifies the location and relevant detailed requirements, while the procurement department handles the cost inquiries; The process team will handle it uniformly when preparing the plan
Reply #72011-02-17
It is organized by system specialty, but the division of labor also takes into account different specialties
Reply #82011-02-17
We have a dedicated safety supervision department here; they are in charge!
Reply #92015-03-03
The process engineering department specifies the basic requirements (such as installation location, type of eyewash station, and medium requirements, etc.), which are then implemented by the water supply and drainage department or the safety department. Every design institute has standard templates; simply fill in the eyewash station datasheet, and that’s it.
Reply #102015-03-03
We even argued over this; the engineering team said that this device wouldn’t move, that it was a static equipment unit, and that it should be handled by such units since they don’t move around. Then they said this item is a special one, so it needs to be made with piping, and the piping won’t fail either. Finally, the manager spoke up: if no one else will do it, then the process team will handle it...
Reply #112015-03-14
“The “Eye Washers” section has now been established; everyone is encouraged to participate. The “Eye Washers” section is located within the “Processes” section

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.