. Slurry pipeline blockage

2011-02-18View Original

Thread Content

This post was last edited by GSP on 2011-2-18 at 15:42. In 1997, the coal slurry pipeline at the Shanghai Coking Plant became clogged once, and a new pipeline was installed thereafter. 2. When I was parking at the Wansheng Chemical Park in Chongqing, I found that the pipeline was blocked. How to avoid this phenomenon?
Reply #22011-02-22
What was said on the 2nd floor is correct; cleaning the coal slurry pipelines promptly is the best approach.
Reply #32011-02-22
1/ Choose coal with good pulping properties; 2/ Select appropriate additives and conduct experiments on water separation from coal slurry ; 3/ After parking, the coal slurry pipeline must be depressurized and flushed within four hours; similarly, the coal slurry circulation pipeline should also be flushed promptly after feeding begins.
Reply #42011-05-07
One can only rinse in a timely manner and ensure the quality of the rinsing

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.