HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Low-temperature methanol washing pipeline design

2011-02-22View Original

Thread Content

Why is it necessary to ensure a certain length of horizontal pipe section before the liquid-phase pipeline enters the tower in low-temperature methanol washing units during pipeline layout?
Reply #22011-02-22
Personally, I think it is to prevent excessive liquid impact and avoid large fluctuations in the liquid level inside the tower.
Reply #32011-02-22
It facilitates operation under various conditions and provides buffering, preventing the gas-liquid two-phase flow from causing shock to the trays due to gas-liquid entrainment

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.