HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

When should venting be carried out before starting up the ammonia synthesis tower, and when should it be done after startup?

2011-02-28View Original

Thread Content

When should venting be carried out before starting up the ammonia synthesis tower, and when should it be done after startup?
Reply #22011-03-01
This similar topic has been discussed before; please refer to this post: http://bbs.hcbbs.com/viewthread.php?tid=717265
Reply #32011-03-02
The venting before and after the synthesis tower is primarily related to the process design and selection, each having its own advantages and disadvantages. However, nowadays most systems use back-pressure venting at the tower; the Kellogg process that was used in the past relied on front-pressure venting. Thanks to technical improvements, most systems now employ back-pressure venting instead
Reply #42011-03-02
Under normal conditions, venting is carried out after the tower is started up to keep the methane level in the system within a certain range; in the case of shutdown and pressure relief, venting after starting up the tower is the main method, with slight venting also done in front of the tower; If the venting is set to a high level before starting the furnace, it may cause gas backflow, which can deposit catalyst powder on the electric furnace and affect its normal operation; in severe cases, this can damage the furnace.
Reply #52011-03-03
The tower vent is generally used for controlling tower temperature and during shutdown pressure relief. When the temperature in the synthesis tower drops, venting before the tower is used to adjust the gas flow, but the opening degree of the vent valve must not be too large to prevent gas backflow.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.