HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with the adsorption tower

2011-03-02View Original

Thread Content

I seek advice from experts: In a pressure swing adsorption (8-tower) system, the pressure in tower B decreased slightly, while the pressure in tower E increased to 1.16 Mpa; pressure equalization should have taken place. However, the pressure in tower E suddenly dropped to 1.03 Mpa, resulting in an adsorption pressure that was 0.1 Mpa lower than that of the other towers after the final pressure adjustment. Which programmable valve is leaking?
Reply #22011-03-02
Valves connected to it and having a pressure on the other side of their valves that is lower than that pressure are all possible, and can be observed cyclically. The leakage rate can be determined by evaluating it, and by observing the relationship between the pressure curve and valve operation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.