Piping purging issues for installing programmable control valves

2011-03-03View Original

Thread Content

The sealing surfaces of programmable valves are prone to damage; therefore, during installation, all pipelines must be welded with TIG welding as a base layer, and the inside of the pipelines must be kept clean to minimize the presence of weld splatter and slag; Before installing the programmable valve, the pipelines and adsorption towers should be cleaned using soot blowing or blast cleaning; this is the principle to follow. However, when welding the pipelines, it is common to install the valve first and then weld the pipelines. Due to the large number of valves in the PSA system, if all valves were to be removed before purging, blasting would not be possible; some pipelines could only be removed and tapped, but it seems that the valves still need to be reinstalled when purging the main pipelines. I wonder if there’s a better way to purge it?
Reply #22011-03-03
During pipeline purging, all automatic valves have to be removed; it seems there are no other methods of purging.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.