Thread Content

This unit is a C9 hydrogenation plant with an annual capacity of 50,000 tons. In the event of an accident, the amount of material discharged through the flare system is around 35 tons. How much would such a flare system cost? I would appreciate it if experts could provide an answer. Thank you
Reply #22011-03-29
The flare for the C9 hydrogenation unit is usually a ground-based flare. As for the cost estimation, it depends on specific gas parameters and local environmental conditions; please contact me at 13834621583.
Reply #32011-03-29
Hydrogenation of C9 generally does not require such large flares; instead, ground-mounted flares with built-in burners and permanent lights are used. A 35-ton flare is already considered quite large
Reply #42012-08-10
Upstairs, this level of emission is suitable for a surface flare, requiring around 40 burners. It will probably cost around 3 million RMB.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.