HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Boiler renovation

2011-03-29View Original

Thread Content

Due to a decrease in the amount of steam required for production and issues with the generator sets, our plant plans to convert the 180T/h boiler to a 100T/h boiler. Could you please let me know what precautions should be taken?
Reply #22011-03-29
Just reduce the load, that’s all. The modification of the boiler must be designed by a qualified unit.
Reply #32011-04-02
Reply to 2# 3968668: Is it possible to make the furnace chamber smaller?
Reply #42011-04-03
The furnace chamber can be made smaller, but other equipment and processes also need to be adjusted accordingly. It must be designed by professionals, a technical improvement plan must be developed, and construction can only proceed after drawings are prepared by a qualified design firm. It’s very troublesome. Reducing the load is more practical.
Reply #52011-04-03
The drive equipment features variable frequency speed control, and its design has been redone by the manufacturer.
Reply #62013-03-12
Find a qualified design firm to prepare several alternative plans, combining load reduction with technical upgrades.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.