HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The issue with blind plates

2011-04-13View Original

Thread Content

Can a blind flange on a steam pipeline be drilled to connect another pipe? Has anyone done this before?
Reply #22011-04-13
1: What steam? Low pressure, medium pressure, or high pressure? 2: What type of blind plate is it – a flanged blind plate, a welded blind plate, or a clamp-type blind plate? 3: If it’s a welded blind plate, it is recommended to cut it off before connecting the pipe. I’m not sure why you need to make an opening to connect the pipe; if it’s for drainage purposes, that’s fine. (For medium and high pressure steam pipes, it’s best to carry out calculations for reinforcement, add a pipe support, and then weld.) I hope this helps you.
Reply #32011-04-13
What is the form of the blind plate used by the poster? Welded or flanged. It is recommended to use flanges combined with reducing fittings, or flanges of different sizes; this approach is much more reliable than making holes in the blind plate.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.