HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to integrate the foundation of new equipment with that of old equipment

2011-04-13View Original

Thread Content

Dear experts, I have an existing variable displacement pump foundation on which I need to install a turbine; therefore, a new reinforced concrete foundation is required. Could you please propose a solution for integrating the old and new reinforced concrete structures together?
Reply #22011-04-13
Chemical anchor bolts are used; even adding a beam to the roof can be done in this way
Reply #32011-04-18
It can’t be generalized. Calculations regarding the alignment and load-bearing capacity of equipment foundations must be carried out in accordance with the requirements of the process engineering field. For reinforcement calculations and structural measures, refer to professional standards such as the \"Technical Code for Reinforcement of Concrete Structures\" (CECS25-90).

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.