I would like to ask everyone: my unit is about to start up for the first time. What is the recommended purging procedure at the beginning of operation? We have planned a purging sequence that involves air purging, followed by steam purging, then water flushing, water pressure testing, and operational testing with water. Does anyone have a better purging method? Please share your suggestions; I only need details on the key steps, if possible
Reply #22011-04-17
Steam purging – water flushing – water pressure testing – water operation – air purging to drain water. Is it a bit redundant to use both air blowing and steam blowing?
Reply #32011-04-17
I agree with the person above; in the end, the wind should blow away the water. Otherwise, the first batch of products produced by the equipment will definitely contain too much water
Reply #42011-04-18
All new devices are made that way; what’s different about them?
Reply #52012-10-17
Hydraulic testing is carried out first, followed by steam purging

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.