HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

PDS pipeline issues

2011-04-28View Original

Thread Content

In PDS, there is a standard requirement for disconnection at the connection points of the two FW pipelines; how can I remove FW? I am using the REVISE WELD TYPE command
Reply #22011-04-29
This post was last edited by tuliplt on 2011-4-29 08:34. What is fw? The material code for the pipeline? Also, what is the standard for disconnection? What is this standard? However, I have never used the command you mentioned. Forgive my ignorance; I don’t know how to reply to you
Reply #32011-04-29
FW is field welding! field welded,

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.