Thread Content
Is there anyone who is familiar with the commissioning services related to the construction of new large-scale chemical plants? If all the procedures such as preparation, configuration, and commissioning are carried out, how much will it cost? Waiting online.
It depends on what kind of device it is and how long it has been in use. There are many professional driving companies these days, but their prices are quite high! Once you’ve decided on the scale of the vehicle fleet, it shouldn’t be difficult to get in touch with a design institute
Thank you. The investment in the installation exceeds 300 million yuan, with over 500 sets of equipment and 50,000 meters of pipelines – that’s the approximate cost. Also, where can I find a car rental company?
The scale of such a facility is not large, so one can seek out an engineering company or design firm in the industry. Of course, if you have organizational skills, you can also look for similar factories (but, based on the principle that \"competitors are rivals,\" it can be a bit difficult to do so). So the first route is still an option.
Actually, most of the work related to operating driving teams is carried out by the production department. We have encountered companies that specialize in operating such equipment; for example, Boyin Company (I’m not sure if you’ve heard of it). They also recruit technicians and skilled workers from similar factories. Most of them are found through one’s own workshop. Although competitors are rivals, since we’re all in the chemical industry, training is usually provided by those who are ahead of us in this field; so it should not be a problem to ask them for help operating the equipment. It’s really hard to say what the cost will be; it’s usually determined based on the number of people and workdays, plus a technical service fee. Since most of these deals are arranged through connections, it’s truly difficult to give an exact price.
“Contents related to commissioning services for newly built large-scale chemical plants? If all the procedures such as preparation, configuration, and commissioning are carried out, how much will it cost? The investment in the facility exceeds 300 million yuan, with over 500 sets of equipment and 50,000 meters of pipelines. 1. With more than 500 sets of equipment and 50 kilometers of pipelines, this is a significant project (the number of equipment units is even greater than that of a million-ton ethylene plant). However, an investment of over 300 million is hardly sufficient to justify a new large-scale coal chemical plant; at best, it amounts to a coal preparation system. So, there is some information asymmetry. 2. Procedure development and DCS configuration should be the responsibility of the engineering party (either the engineering company or the supplier), including the operation manuals; this should not fall under the scope of commissioning services – the contract should be checked for details. 3. For driving services, you can refer to this to determine the scope of work – specifically, what tasks are involved in providing driving services. You can ask the engineering company or installation unit working on your project to continue providing this service, or you can invite a manufacturer of the same type to assign a fleet of drivers. For the fees, you can ask them to provide a total price as well as separate quotes for each task. Then you make a choice.