HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pipeline lifting plan for the cold box

2011-04-29View Original

Thread Content

Hello, dear Haihao friends! Does anyone know whether, when installing aluminum-magnesium pipes in cold storage units, 250-ton cranes are generally used to lift the pipes, or winches or tower cranes? If winches are used, from which position should the pipes be inserted?
Reply #22011-04-29
Before sealing the cold box panels, pre-made large-diameter pipes can be lifted to the desired position using a crane, so as to prevent them from not being able to be inserted after the panels are sealed. Smaller pipes can be lifted using a winch, which helps to save costs
Reply #32011-05-01
The large cranes we used before were too big; they had tracks, and they were extremely expensive. Cranes are supposed to help save money, but I’m not sure if they can lift heavy loads

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.