What specifications must be followed during the installation of a pump?

2011-05-04View Original

Thread Content

What specifications must be followed during the installation of a pump? Thank you:victory:
Reply #22011-05-04
As long as it complies with the installation instructions for the pump, that’s sufficient!
Reply #32011-05-05
Is there no national standard? :):handshake
Reply #42011-05-05
In accordance with the installation specifications for chemical processing machinery, there are specified requirements for each step: foundation inspection, leveling of the base, secondary grouting, initial alignment, stress inspection of the inlet and outlet pipeline flanges, individual testing of the motor, and precise alignment. It’s best not to follow the pump’s instructions, as they are usually very simple and do not meet the required standards.
Reply #52011-05-06
GB50231-2009, GB50275-2010, HG20203-2000, SH/T3548-2005, SH/T3541-2007 – these are all the standards in use

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.