HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What issues should be considered during the shutdown of a urea plant?

2011-05-06View Original

Thread Content

I hope everyone can give me more suggestions. Thank you
Reply #22011-05-07
Regardless of the urea production process, it is necessary to pay attention to preventing blockages and corrosion during shutdown; your operating procedures/process guidelines should require this.
Reply #32011-05-07
There are specific requirements for the operation method; aside from the second floor, considering the angle at which the protective equipment is positioned, attention must also be paid to the rate of pressure release and temperature reduction.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.