After the foundation of the tower is completed with concrete, how many days does it usually take before lifting can proceed?

2011-05-06View Original

Thread Content

I would like to ask everyone: after the foundation of the tower is completed with concrete, how many days does it usually take before lifting operations can begin? How can this time be made as short as possible?
Reply #22011-05-07
It depends on how much the strength of the concrete has reached the design value; there’s no need to rush
Reply #32011-05-09
Recommendation: Before construction, contact the designer to determine the concrete strength value at which work can proceed with the tower lifting, that is, the strength level of the concrete required for this purpose; Keep a few extra sets of test blocks; use experience to make an initial estimate of the strength that the concrete may achieve. Based on the test block strength reports, you can proceed to the next stage of work, and neither the supervisor, the general contractor, nor the owner can do anything about it. . .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.