How should I write a safety pre-assessment?

2011-05-15View Original

Thread Content

How should I write a safety pre-assessment? This construction project will be carried out in two phases; Phase 1 has already been completed, while Phase 2 has not yet started. A preliminary evaluation needs to be prepared now, but the feasibility study did not provide clear details regarding Phase 1 and Phase 2. They simply increased the amount of equipment used in an attempt to reach the total production target, and that equipment is from Phase 1. If we are to prepare a preliminary evaluation, should it be done separately for each phase, or should we follow the approach taken in the feasibility study and proceed in a vague manner? I really don’t know how to handle the subsequent inspections. I hope Haiyou can give me some help.
Reply #22011-05-15
Although the main basis for evaluation is the feasibility study, I think it’s better to conduct a preliminary evaluation in two phases. The reasons are as follows: First, with the expansion of production scale, is it feasible from a production and safety perspective to simply scale up the equipment? Secondly, the general layout will definitely be different between the two phases and the first phase. Thirdly, if the preliminary evaluation is conducted by over-specifying the equipment, and the design of safety facilities is done in the same way, how can acceptance testing be carried out? (In stricter areas, companies may be required to go through the three simultaneity procedures again.) Write it in two phases; simply explain the pros and cons to the enterprise and revise the feasibility study accordingly.
Reply #32011-05-15
Does the poster mean that phase 2 is just a simple copy of phase 1? The general layout for such a project must be clear, indicating which facilities are part of Phase 1 and which are part of Phase 2. A preliminary evaluation can be conducted for both phases together; if the process technology involves simple replication, things are straightforward, but the general layout may require more detailed description. As for acceptance, we can carry out the design of safety facilities in batches and conduct the acceptance in batches as well. If a report is issued for each of phases one and two, there will be too much repetitive content. Also, note whether the project registration is done in phases.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.