Thread Content
Sludge treatment process: Dongxing Chemical Co., Ltd. (Sludge Treatment Project). Principles of sludge treatment: feeding – demulsification – conditioning – separation of sludge from water – chemical addition – centrifugal dewatering – drying – bagging. Equipment for tri-clay treatment ; The sludge oil system includes a sludge oil inlet (sludge adjustment tank), filters, and a sludge pump; the flow rate is adjusted according to the annual processing volume (sludge separation unit), where demulsification takes place. The demulsified sludge oil then enters a water-sludge separator, and after separation, it is pumped into the sludge oil system by a sludge oil pump. There is also a demulsifier tank and a demulsifier pump, as well as a conditioner tank and a conditioner pump. The pH value of the material after conditioning is kept between 6 and 8. The conditioned material enters a sludge-water separator, and after treatment, the water is sent to a wastewater treatment plant. After going through these processes, the sludge is pumped into a centrifugal dehydrator using a sludge pump and a dosing pump; the dehydrated sludge is stored in a sludge tank. The dehydrated wastewater is sent to a wastewater treatment plant. The sludge from the tank is pumped into a paddle dryer using a dry sludge pump for drying purposes. The gases generated during the drying process are directed to a water seal purification tower for cleaning. The dried mud can meet the **required emission standards**. It can also be sent to the incineration system for burning. The entire system utilizes a (PLC) automatic interlock system. It’s very easy to use.
Is it energy-intensive? How much exactly?
(Oil sludge pump: 1.5kw), (Demulsifier pump: 0.5kw), (Conditioner pump: 0.5kw), (Conditioner unit: 1.5kw), (Sludge pump: 0.5kw), (Chemical dosing pump: 0.5kw), (Centrifugal dehydrator: 26kw; its operating time is 1/7 of that of the other equipment), (Dry sludge pump: 1.5kw), (Blade dryer: 7.5kw; its operating time is 2/7 of that of the other equipment). The annual processing capacity is 8,000 tons, based on 300 days per year.
Have you dealt with the sludge resulting from the refining of oil shale? Is the investment for your processing project large? How’s it working?
Hello! I would like to learn more about your products. Do you have any detailed information?
The process is fine; just pay attention to the details. What is the drying temperature, and what is the energy consumption?
Hello! I would like to learn more about your products. Do you have any detailed information? If it’s convenient, send it to my email gsq945@yeah.net