Regarding the handover issues in moving equipment

2011-05-29View Original

Thread Content

Our factory has newly installed a compressor; the signature for acceptance was given at the back of the unit. Later, issues such as air leakage from the airtight valves of the unit and the need to replace the lubricating oil arose. Are we responsible for dealing with these issues? (We are the equipment maintenance department, and we are in charge of the acceptance process during the testing phase.) Also, once CCCC signs off, should it be our responsibility to carry out the maintenance of the equipment, or should it be handed over to our maintenance department only after the process media are in normal operation?
Reply #22011-05-30
After CCCC, it is the owner who takes over management.
Reply #32011-05-30
After the trial run is completed and the documents are handed over, the owner takes over for management and maintenance.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.