HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What exactly is the load during the low-load operation phase of the newly installed methanol synthesis process?

2011-06-06View Original

Thread Content

What exactly is the load during the low-load operation phase of the newly installed methanol synthesis process? Should it be based on the amount of crude alcohol produced or on the gas volume?
Reply #22011-06-07
Based on the gas volume, the minimum gas volume should not be less than 30% of the designed value
Reply #32011-06-07
As long as the compressor is fine and the temperature of the synthesis tower can be maintained, it’s okay.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.