Can the take over passing through the jacket and the inner cylinder be welded directly to the jacket?

2011-06-08View Original

Thread Content

The take over passes through the jacket and the inner cylinder; is it possible to weld it directly to the outer jacket as well, when welding it to the inner cylinder body, so that there’s no need to trim the edge of the outer jacket?
Reply #22011-06-08
Sure. . . . . . . . . . .
Reply #32011-06-08
Oh, thank you. I’m not sure why, but generally, it’s the joint where the pipe is welded to the inner cylinder that requires flanging of the jacket, rather than welding the pipe directly to the jacket
Reply #42011-06-08
1. In chemical processing, direct welding causes temperature changes in this type of pipe. 2. There is a risk of corrosion on both sides. 3. It is difficult to meet the requirements during the manufacturing process; therefore, it is rarely seen. . .
Reply #52011-06-08
Reply 1# yfscm: The tube that passes through the jacket and the inner cylinder should not be welded to the inner cylinder body, nor should it be directly welded to the outer jacket. The outer jacket should be edged or separated with a sleeve.
Reply #62011-06-08
I indeed didn’t see any instances of direct welding to the jacket. Is it not allowed (no specific regulations were seen), or is it better to avoid it? I’m a bit confused
Reply #72011-06-08
Reply to 6# yfscm: For welding such a type of structural joint to the inner cylinder, it seems that an internal bevel weld must be carried out from inside the inner cylinder.
Reply #82011-06-08
Reply to 7# Wen Bing: If allowed, it would definitely be an internal groove on the inner cylinder and an external groove on the jacket
Reply #92011-06-08
It is generally not recommended to use it; however, if the device is too small and this structure is unavoidable, then it has to be used.
Reply #102011-06-08
If welding is done on both the inside and outside, stress will be generated due to deformation from welding, which is unsafe
Reply #112011-06-08
I agree with the view from the 10th floor: welding both the inner and outer parts generates welding stress. If the outer tube is welded to the pipe after the inner tube has been welded, it will result in fixed constraints, preventing the stress from being released and increasing the risk of damage. This is especially problematic for containers subject to stress corrosion!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.