Can the circulating water pipes pass through Class A production buildings?

2011-06-13View Original

Thread Content

Can the circulating water return pipe (Φ219) in the factory pass through the Class A production building?
Reply #22011-06-13
Aren’t such large pipes usually delivered underground? Then allocated to the workshop. The main pipes are installed outdoors
Reply #32011-06-14
It can be passed through; the building codes only require that combustible materials cannot pass through firewalls! I have worked on similar projects
Reply #42011-06-15
Thank you! Help! :) :victory:
Reply #52011-06-15
It can be crossed. If a firewall is encountered, it can also be bypassed, but a sleeve needs to be added and filled with something else. The blast wall cannot be crossed.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.