Natural gas pipeline opening issues

2011-06-15View Original

Thread Content

There is currently a DN150 natural gas pipeline, and an outlet branch pipe is desired to be created in the middle of it. Please ask a professional to come up with a plan. Thank you!
Reply #22011-06-15
Calculate reinforcement, develop a welding plan, weld, inspect, and it’s done.
Reply #32011-06-15
Just set up a branch pipe station and that’s it; no calculations needed.
Reply #42011-06-15
After welding, inspection is probably still needed. Should we apply pressure?
Reply #52011-06-15
The general steps mentioned by those upstairs are correct; could someone provide me with a more detailed welding plan? Or if you have done design work in this area before, provide scores and reference materials. Thank you first

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.